What a job sheet should show a commercial customer

By the Field Suite editorial team. Every fact checked against its official source (Supply of Goods and Services Act 1982, Consumer Rights Act 2015 and PSSR 2000 on legislation.gov.uk, HSE L8) on 5 November 2026.

Short answer: a job sheet for a commercial customer should show who attended, when they arrived and left, which site and asset, what was asked for, what was done, readings and parts used, faults found with how urgent they are, certificates issued with next due dates, photos, and a named sign-off. Send it the same day. The customer's facilities team uses it to approve your invoice and keep its records.

Why the job sheet matters

  • It is your evidence. In a business-to-business service contract in England, Wales and Northern Ireland, the law implies a term that the supplier "will carry out the service with reasonable care and skill" (Supply of Goods and Services Act 1982, section 13). Consumer contracts are covered by the Consumer Rights Act 2015 instead, which implies the same care and skill term (section 49). A clear sheet shows what you did and what you found.
  • It feeds the customer's records. On a site with water systems, HSE's L8 says records should normally include remedial work required and carried out with the date of completion, "a log detailing visits by contractors, consultants and other personnel", and the signature of the person who did the work or another form of authentication (para 74).
  • It gets the invoice paid. Facilities teams match the sheet to their order before they approve payment.

What the sheet should show

Contents of a commercial job sheet
SectionWhat to includeWhy the customer needs it
HeaderYour firm's name, address and contact details; the job reference; the type of jobFiling and queries
Customer and siteCustomer name, billing address, site name and full addressMany customers run dozens of sites
Their referenceThe order or PO number and their own job referenceMatching the sheet to the order before paying
Who and whenEngineer's name, arrival time, completion timeChecking response times and time charged
AssetName, make, model, serial number and locationUpdating their asset register and history
What was askedThe fault or task as reportedShows the request was answered
Work carried outPlain words, in the order it was doneThe core of the sheet
ReadingsPressures, temperatures, currents, as found and as leftTrend over visits; compliance logs
Parts and materialsItem and quantityChecking parts charged
Found on the visitEach defect, with urgency and a recommendationBudget decisions and risk records
Certificates and formsEach one issued, its reference, result and next due dateCompliance diary
PhotosBefore and after, with captionsProof without a site visit
Sign-offName of the person who signed, the time, or why nobody signedAcceptance of the work
Layout of a one-page commercial job sheet A page outline divided into blocks from top to bottom: header with firm and job reference; customer, site and order number side by side; engineer with arrival and completion times; asset with make, model and serial; work carried out with readings; parts; found on the visit with urgency; certificates with next due date; photos; and sign-off with name and time. Your firm · Job sheet JOB-1042 Customer and site Their order number Engineer · arrived 08:40 · completed 11:15 Asset: make, model, serial, location Work carried out and readings Parts Found: urgency Certificates, next due Photos Signed by name, date and time Matches the order Checks the time Drives the next quote Accepts the work
One page is enough for most visits. The highlighted blocks are the ones facilities teams check first.

What to leave off

  • Your costs and margins. The sheet is not a cost breakdown.
  • Internal notes and spend limits. Office notes about the customer, or the most you are allowed to spend without asking, stay inside your firm.
  • Vague words. "Checked system, all OK" tells the customer nothing. Say what was checked and what the readings were.
  • Claims you cannot back. A job sheet is not a certificate. Where the work needs one, such as a gas safety record or an electrical report, issue it separately and list it on the sheet. For a pressure system, the competent person's written report of examination has its own contents set by law (Pressure Systems Safety Regulations 2000, reg 9(5)); a job sheet does not replace it.

Worked example: a booster set call-out

An FM company raises an order for a low-pressure complaint on the top floor of an office. The engineer finds pump 2 of a twin booster set short cycling and the vessel precharge low. The sheet reads:

The example job sheet, section by section
Their referenceOrder 45810, FM ticket 2291 (example numbers)
Who and whenEngineer on site 08:40, completed 11:15
AssetTwin-pump booster set, basement plant room, make, model and serial number
ReportedLow water pressure on floor 3
Work carried outIsolated and locked off. Vessel isolated and drained on the water side; precharge found 1.8 bar, set to 3.15 bar to suit cut-in of 3.5 bar. Pump 2 cycling every 20 seconds before, normal after. Both pumps test run.
ReadingsInlet 1.2 bar, outlet 5.0 bar at cut-out, cut-in 3.5 bar
PartsNone
Found on the visitPump 2 seal weeping. Recommended: replace within 3 months. Quote to follow.
PhotosGauge before and after; seal leak
Sign-offSigned by the building's facilities coordinator at 11:15

The precharge method is in booster set servicing. The FM company can approve the invoice against order 45810, add the seal to its budget, and attach the sheet to the asset's history.

Who does what

  • The engineer writes the work, readings and findings on site, takes the photos and gets the sign-off.
  • The office makes sure the order number and the customer's reference are on the job before the visit, sends the sheet, and turns findings into quotes.
  • The customer's representative signs to confirm the visit, or the engineer records why nobody signed.

What to record and keep

  • The sheet as sent, with its date, and who it was sent to
  • Certificates issued on the visit, kept with the sheet
  • For Legionella monitoring tasks, the results and dates: L8 says keep them for at least five years (para 72)
  • Any correction made after sending, with the reason

Job sheets in Field Suite

  • The PDF job sheet carries your logo, colour and footer, and shows the customer, site, engineer, arrival and completion times, the asset with make, model and serial number, the work carried out, parts and quantities, faults found with how urgent they are, certificates and forms with their result and next due date, photos, and the customer's signature with name and time. You choose whether photos and parts appear.
  • Sign-off on the phone: the customer signs with a finger. If nobody can sign, the engineer records the reason.
  • Sent at signing: you can have the sheet emailed to the customer as soon as it is signed, with signed certificates attached. The customer portal also keeps past job sheets and certificates.
  • Order numbers: the PO number is held on the job and carried to the quote and the invoice, and a customer can be set so an invoice cannot be sent without one. The job sheet PDF does not print it, so quote it in your covering email if the customer wants it with the sheet.
  • Readings: ready-made forms include a pump service checklist. For other readings, add your own questions in the form builder.

Read about PPM schedules and the pump service checklist, see planned maintenance software, pump maintenance software and subcontractor management, check prices, or book a demo.

Field Suite is job management software, not a law firm. Your contract with the customer sets what each visit must deliver.

Questions

Is a job sheet the same as a service report?

Often the words are used for the same document. What matters is the content: who, when, what was done, readings, findings and sign-off.

Should the customer always sign?

Get a signature where you can. If the site is unmanned or nobody is available, record why, and send the sheet anyway.

Can I put the price on the job sheet?

You can. The sheet goes to the site and the invoice to the accounts team, so ask the customer where they want prices to appear.

Can a job sheet be changed after it is sent?

Correct mistakes openly: send a corrected version, say what changed and why, and keep the original.

Sources

Last checked: 5 November 2026 against the sources above.

Field Suite is job management software for UK building services firms, not a consultancy. Your own risk assessments, contracts and advisers decide what applies to your work. Spotted a mistake? Email info@fieldsuiteapp.com and we correct it.

Run the work and the records in one place

14 days free with every feature and up to 10 users. No card details and no contract.